Foundations for Expandable Homes in Queensland

An expandable home needs a stable, level base. Get this right and the home unfolds cleanly, its doors and panels line up, and water stays away from the frame. This guide covers the base options, our recommended footing layout, and where your engineer and certifier make the final call.

Base options

Depending on your site and how you'll use the home, it can sit on any of these:

Foundation options for expandable homes
BaseWhat it isNotes
Concrete footingsIndividual concrete pads under the frame's support pointsOur recommended starting layout (see below)
Steel piersAdjustable steel posts on footingsUseful where the ground is not perfectly flat
Concrete slabOne continuous concrete baseMust be poured and cured before delivery
Levelled gravel padA compacted, level gravel surfaceConfirm suitability with your certifier for permanent use

Recommended footing layout

For footing-based installations, this is our starting recommendation:

Recommended footing layout
ItemRecommendation
Number of footings6 to 12, depending on model
TypeConcrete blocks or steel piers
Recommended size400mm × 400mm
Minimum depth300mm, varies by soil type

The exact number and position of footings depends on the model. Longer homes need more support points. We can provide the layout for your chosen model before you start site works.

How the home is levelled

On delivery day, the installer will:

  • Position the home on the footings
  • Check it is level
  • Make sure the weight is evenly distributed

Levelling matters more for an expandable home than for a fixed one. The fold-out walls and floor sections need to meet the main module accurately. Peg out the exact home position before delivery so footings line up with where the home will sit.

Drainage around the base

Water should never pool under the home. Slope the ground slightly away from it, and add gravel or drainage channels where needed. A dry underside helps prevent rust, mould, footing movement and moisture damage.

Who decides the final design

Our footing layout is a starting point, not an engineered design. Your engineer or building certifier has the final say, and their requirements can change based on:

  • Soil type and how reactive it is
  • Your site's wind region
  • Whether the home will be a permanent dwelling
  • Slope of the block
  • Local council and certifier requirements

Footings are normally inspected as part of building approval. The council approval guide and the Class 1a guide explain where that fits. For access, levelling and the full pre-delivery checklist, see the site preparation guide.

This guide is general information, not engineering, legal or building advice. Requirements vary by site, council and intended use. Confirm your specific situation with a licensed building certifier, engineer and your local council.

Talk to us about your site

Display home inspections and consultations in Inala are available by appointment.